
North Vernon-based Dave O’Mara Contracting will drive steel piling on either side of the bridge and place a 50-foot crossbeam across the center. When complete, the bridge will be a two-span structure and there will be no weight limit. The value of the work is estimated to be about $90,000.
The bridge was closed in late June after an inspection uncovered structural deficiencies. During the closure heavy traffic will be required to use State Road 229, I-74 and Decatur County Road 850 East.



