Osgood, IN—Southeastern Indiana REMC has announced A critical peak load control event that will occur from 5-8 p.m. EDT on Today. They ask everyone to please reduce energy use.
A peak load is a term used in energy demand management, describing a period in which electrical power is expected to be provided for a period of time at a significantly higher than average supply level.