
The Franklin County Water Association will pay the $296,300 to repair the 700-foot water main during construction in 2019.
Officials say the estimated 20-percent municipal-share of the cost to repair the Fairfield Causeway Bridge will be about $320,000.
The total cost of the project will be about $1.6 million, the state will pick up about $1 million.
The bridge was built in 1972 and was determined to be fair to satisfactory following the most recent documented state inspection in October of 2016.



