
The contract includes a 3/8-inch polymeric deck overlay in two lifts on the 815-foot long structure—adding flint chips to provide proper coefficient of friction for optimum maneuverability and stopping capabilities.
Temporary signals on either side of the bridge will permit one-direction-at-a-time single lane traffic flow at the bridge.



