Construction to affect routes to four State Park properties

Brookville, In. — Four big construction projects starting this month will affect guests traveling to Brown County State Park, Clifty Falls State Park, Hardy Lake and Brookville Lake for part or all of the summer season.

The project affecting Brown County State Park could start as early as next week.
The most current information about alternative routes can be obtained at stateparks.IN.gov/7881.htm or by calling the respective property office, as listed below, before traveling.
The projects include:
BROOKVILLE LAKE: Fairfield Causeway Road will be closed from April-October, for major reconstruction. Access to Mounds State Recreation Area is still from State Road 101. Quakertown SRA can be accessed from S.R. 101 on Dunlapsville Road. At least one pier of the Fairfield Causeway bridge is expected to remain open to boat traffic during the project. Call 765-647-2657 before visiting.
BROWN COUNTY: The north entrance into Brown County State Park, 2 miles east of Nashville, on State Road 46, will be closed from April 8 – May 9, while repairs are made to the park’s historic Ramp Creek Covered Bridge. During the time that the bridge is under repair, park visitors must use the park’s west entrance 2 miles south of Nashville on S.R. 46. Horse campers can continue to use the south entrance into the equestrian campground. Call 812-988-6406 before visiting. NOTE: The bridge is the only surviving “double barreled” covered bridge in Indiana, and one of only six in the nation. It is also the oldest surviving covered bridge in Indiana. Originally built in Putnam County in 1838, it was moved to its present location, spanning the north fork of Salt Creek, by the Indiana State Highway Commission in 1932.
CLIFTY FALLS: Beginning in early April, State Road 256 from Austin to Hardy Lake Road will be closed for a road-widening project. This is the primary access to Clifty Falls off I-65 for guests traveling from the north. This project will continue through the summer. From I-65, guests should take the Scottsburg exit (S.R.56), and head east toward Madison, then take S.R. 56 east all the way into Madison to access the park. An alternative route is to take S.R. 56 to S.R. 203 north to reach S.R. 256, then head east to Clifty Falls State Park. Call 812-273-8885 before visiting.
HARDY LAKE: Beginning in early April, State Road 256 from Austin to Hardy Lake Road will be closed for a road-widening project. This is the primary access to Hardy Lake off I-65 for guests traveling from the north. This project will continue through the summer. From I-65, guests should take the Scottsburg exit, and head east toward Madison, then head north on S.R. 203, crossing over S.R.256, and continue north on Hardy Lake Road to the property. Call 812-794-3800 before visiting.
A map of INDOT’s Next Level Roads current and future construction projects is at https://www.in.gov/indot/
To view all DNR news releases, please see dnr.IN.gov.