Traffic Shifting At U.S. 50 And I-275 This Week

LAWRENCEBURG – The second phase of a project to repair and resurface the ramps connecting U.S. Highway 50 with I-275 east of Lawrenceburg begins this week.

Traffic will be shifted from one side of the ramps to the other on Monday or Tuesday.

Crews are making concrete repairs to U.S. 50 connector ramps about one mile from the Indiana-Kentucky state line.

Once repaired, a 2-inch overlay will be put in place. INDOT says slabs and pavement transitions are also being reworked.